FSO Cendor  
Field Information  
  Location   Cendor Field, Block PM304, Terengganu, Malaysia
  Water Depth   63 meter
  Field Operator   Petrofac Malaysia Ltd.
       
Tanker Particulars  
  Owner   MISC
  Operator   FVSB
  Year Built   1983
  Year Converted   2006
  Classification   BV
  Registration   Port Klang, Malaysia
  1st Oil Date   23 September 2006
  LOA   224.6 m
  Breadth   32.2 m
  Depth   19.6 m
  DWT   63,155 MT
  Storage Capacity   517,798 bbls
  Ballast Tank   27,440 m3
       
Basic Design  
  Metering System   4 x crude oil metering streams and
1 x bi-directional prover loop
  Helideck   N/A
  Crane   1 x 5T and 1 x 9T SWL
  Accommodation   35 persons
  Export System   Tandem Mooring
  Cargo pumps   3 x 2,750 m3/hr (diesel driven)
  Generator   3 x 580 kW, DG
  Boiler   1 x 40 T/hr at 16 bar
  Fuel Gas   N/A
  Topsides   N/A
  Water Injection   N/A
  Gas Compression   N/A
  Mooring System   Spread Mooring
  No. of flexible riser   1 x 6
       
core businesses > offshore floating facilities  > in operations